Let's say I have a job that has been running for numerous hours and is only half way through the job and I need to patch and reboot the server. Can I suspend the job so that I don't lose the progress I have made up to that point.?
Thanks,
Randy
Let's say I have a job that has been running for numerous hours and is only half way through the job and I need to patch and reboot the server. Can I suspend the job so that I don't lose the progress I have made up to that point.?
Thanks,
Randy