Hello,
Need you expert suggestions on this.
I am having DP 9.01 with CM on windows 2008 R2. I have windows & Linux clients in my enviornment. Backup configured are Filesystem, SQL integration, Oracle Integration & Exchange 2010. All the backups are done on MSL having Ultrium 5.
Now my requirment is for the DR drill I need to take my all backup tapes from production to DR site import them in DR cell manager and do the restoration. Then do the DR drill, this process is very lengthy as importing of tapes takes very long time becuase of too many tapes. I need to automate this process and makes it quick so that my DR setup is ready to restore backup within 30 -60 mins in case of disaster whereas currently it takes days.
Ay suggestion how to achieve this?
I was planning of importing the IDB from production to DR CM but in that case I am loosing the IDB & Sessions of DR backup which I am taking weekly and need that as well at the time of DR drill.
Appreciate any suggestions on this.
Regards,