I have 2 libraries (each library has n.1 drive) of 24 tapes each one and DP ver. 8.13; I can schedule n.2 backup tasks at the same time (parallel way) on the different libraries
I already organized my backup tasks into groups according to backup type and one time a day I send report for all sessions which contains all tasks for noth libraries.
Now I need to detect quickly detect free time slice for new backups to add on each library so I thought to move my tasks into 2 groups, one group for every library but I cannot change my logical groups structure.
Can 'backup task' belong to 2 groups?!?!