I am running DP 6.2 on windows 2003 and want P to V it as part of a mutistep upgrade project.
Can I move the changer control to another server and have the Cell as a VM?
I would like to move the 6.3 to a VM, update to 7 and then move to 8 or 9.
I am running DP 6.2 on windows 2003 and want P to V it as part of a mutistep upgrade project.
Can I move the changer control to another server and have the Cell as a VM?
I would like to move the 6.3 to a VM, update to 7 and then move to 8 or 9.