Hi
I'm currently using DP 9.02 on Windows
I have some questions regarding the advanced scheduler feature:
1. Is there a way to generate a report for schedules configured in advanced scheduler? I tried generating the report but it doesn't include the advanced scheduler
2. How do I view all schedules configured for all backup specs in advanced scheduler? In the old scheduler, selecting the top level group displays all backup specs and their respective schedules.
3. How would I back up the schedule?
Thanks
Ang