Hi,
I'm considering a side by side migration from DP 6.2 to DP 9.02. Does anyone know how possible it is to retain the DP6.2 and the DP 9.02 clients concurrently on the servers (that are backed up) in the environment?
Or, can the 6.2 client co-operate with the DP9.02 cell manager?
Kind Regards
Graham