Hi All!
My problem:
Some Production scheduled backups runs as a "preview".
That is, at the time specified in the scheduler backup does not start.
IDB does not contain information about this session.
But there is an entry in the events:
[138:742] Backup session "R-2015/01/06-273" of the backup specification "",backup group "Default" has errors: 2.
Description:
Errors have been detected during the backup, copy, or consolidation session.
My questions:
1. Is it true I think that session with index "R" - a preview session?
2. If "yes" - Why DP start some sessions in preview mode? Its no good :-(
PS DP ver 8.01 on OS SLES
Thanks!!!
Best regards
Vladimir